 |
|
 |
 |
 |
 |
| |
|
|
| |
Public works distill and embody a site's life cycle. |
|
| |
|
|
 |
 |
 |
|
|
|
|
|
|
LIMB TUNNEL (detail) 2009 Hardwoods 96" x 100" x 68'
|
Sponsored by the Arbor Day Foundation in Nebraska City, NE, the Limb Tunnel was meant to evoke its surroundings through its shape (that of a downed limb) and through the material of wood. Constructed on site over the course of one week, the tunnel offers visitors to the Foundation the opportunity to walk through the sun-soaked interior. A type of redemptive path. |
|
|
|
 |